So far, so good. There is ribbing at the waist and mid arm, which creates the slight illusion of shaping, but easier. I'm considering edging the neck with single crochet for stability, but won't be sure until it's all knit up. Just one arm left! Yay!
Saturday, January 31, 2009
As Promised
So far, so good. There is ribbing at the waist and mid arm, which creates the slight illusion of shaping, but easier. I'm considering edging the neck with single crochet for stability, but won't be sure until it's all knit up. Just one arm left! Yay!
Friday, January 30, 2009
The Suckage. I Has It.
First of all, the baby cardigan was finished less than 24 hours after that last post. The public humiliation of my failings was too much to bear, and I finally got it right. Both sleeves match each other, and it's washed and everything. It does still need a final pug-hair check, and perhaps a tumble in the drier to fluff up the cotton (it was dried flat, because I fear premature pilling), but it looks pretty good and it felt awesome to finally finish that sucker.
My lovely new socks from the Shalimar Yarn are also finished, and I lurve them. The yarn was awesome to knit with, and I'm really excited to try the other weights (once some of the stash is gone, of course). I think I'd really like to try a sweater with another stonewash colorway.
Cassidy's sweater (the light blue Classic Cotton raglan) is going surprisingly well. I'm completely winging the whole thing, and it's really quite amazing that I haven't had to rip it out even once. I'm nearly done with the first sleeve, and I'm not quite sure how long to make them, but I'm not too worried. I have lots of experience ripping out sleeves. :)
Okay I guess that's it. Now where is Scott? I need to get to knit night!
Sunday, January 11, 2009
I Wish We Still Had a Fireplace
Tuesday, January 6, 2009
Resolutions. Maybe.
The socks were finished before the end of the year, as was Scott's hat:
They look good and fit, and Scott likes them. Win! Scott's scarf has been started, and is now about two feet long. Here is a picture of my Robosapien helping out about 18 inches ago:
I wish I could teach him to knit, that would rock.
The scarf has been put aside for a few days (until I forget how sucky it can be to knit six feet of the same. thing. over. and. over.) and right now I'm working on a pair of socks with Shalimar Zoe. They're just plain vanilla socks for myself. Pictures coming later, when they look more like socks.
I've been thinking a lot about making some sort of knitting resolution. My calculations tell me I have over 18 miles of yarn, not including yarn for projects already cast on. That's a lot of yarn. Especially considering I just got rid of a garbage bag full of extra/leftover skeins, remnants, and acrylic I probably wouldn't have used. It's possible that perhaps I should use some of it. Also, perhaps I should also finish some of the unfinished projects I have laying around.
So here's my plan: I am going to buy yarn for one more project (two friends are having kids, I only have yarn for one baby project). After that, no more yarn until I work through 5 miles of yarn. That's 8800 yards, and like I said- it doesn't include WIPs. Which brings me to the second part of my resolution...
I am going to finish the following WIPs this year: the baby sweater missing one sleeve, Cass's top, Scott's scarf, the Shalimar Zoe socks, the Clapotis, and my Boyfriend Sweater. I think that's reasonable, and will make a lot of room in my yarn cabinet.
The only part the sucks is that if I don't polish off five miles by May, I don't get to go to the Maryland Sheep and Wool Festival. For now, I'm considering that to be a motivator, and maybe if I work through at least half, I'll let myself go and get just a small amount (but way less than the 4400 yards I have to get through).
I'm off to get started- and I won't hold it against you if you fell off your chair laughing at the idea of me not buying yarn for at least 5 months.
Sunday, December 28, 2008
Quicky
Thursday, December 25, 2008
I Need a Nap!
And the mail lady got this hat:
Sorry that's such a crappy picture. It's ribbed with cables, in Patons Shetland Chunky. It came out okay for a last minute hat, but I wish I had done the decreases differently- they look a little too obvious in a couple places.
The biggest problem with the socks was that I ran out of yarn. I had two 50g balls of Patons Kroy Sock yarn, and the first sock still has about two inches (including the toe) to go. Of course, this all came to light yesterday afternoon- while Scott had our only car and wasn't due to be home until exactly when the stores closed. So I can't get another ball until tomorrow, but in the meantime I can knit the other sock (which is just past the gusset) until that one runs out. The socks are no longer a surprise, so I can knit them in his presence, and have him try them on to check for length.
If you're planning on knitting men's socks on size 1 needles (I cast on 72 st.) with the Kroy sock, be aware that you may need a third ball!
Now I am also working on a second tam for Scott. The first one (above) was knit up with Patons Classic Wool for the winter, and the next will be cotton for warmer weather. He also requested a scarf, and hopefully I can get the yarn for that this weekend.
Yeesh. I have been knitting nonstop since Friday night. I was so desperate to finish the socks that I pulled all-nighters Sunday and Tuesday. Yesterday I had ice packs and warm packs laying about, and my stomach lining was not thrilled with my diet of coffee and painkillers. Hopefully a few days of extreme knitting won't cause any irreparable damage. I did take a few breaks and stretched often, so I think my hands will be fine after some rest!
Friday, December 19, 2008
There Are Two Sides to Everything
This also means that I am a total slacker every time I knit anywhere other than knit night. Why can't I be that focused at home? Maybe it has something to do with coffee? Or maybe I'm just too easily distracted at home. Oh, who knows. It could be anyth